Report this item to Etsy

Dependency Dates Python Tool, Task Prerequisites to Inclusive Calendar Dates, Offline JSON Project Arithmetic with SVG Timeline Reports

Price:£3.36

Loading
Includes Etsy Purchase Protection

You can only make an offer when buying a single item.

Highlights

  • Digital download
  • Digital file type(s): 1 ZIP
Sorry, we could not translate this listing to English.

DEPENDENCY DATES — calendar-day prerequisite arithmetic
AI-assisted original code and report layout. Digital files only.

PURPOSE
Define a project start and up to 30 tasks with durations and prerequisite IDs. This local Python tool calculates the earliest dates allowed by YOUR entries. It is not a forecast, delivery commitment, resource optimizer, critical-path/slack analysis or professional project-planning service. Parallel tasks may overlap even if one person would have to perform them. Weekends and holidays count as ordinary calendar days.

REQUIREMENTS
Python 3.10+ standard library and desktop terminal experience. No extra package, account or internet connection is used by the helper. Linux execution and Inkscape CLI SVG export were tested. Windows/macOS/mobile, GUI editing workflows, spreadsheet imports and other apps are untested. No Excel/Google Sheets/Canva/PDF file is included.

RUN THE EXAMPLE
Unzip, open a terminal in this Buyer folder, and run:
python3 dependency_dates.py examples/fictional-project.json my-calculation
Choose a NEW output directory name. Existing paths are refused, not overwritten. Open results.txt/results.json and dependency-dates-01.svg in the output folder.
Copy fictional-project.json to a new UTF-8 JSON file, replace the task assumptions, and run again into another new directory. Inputs are unchanged. Reports contain your task labels/dates; inspect them before sharing. No network requests or external integrations occur.
Optional SVG export to a new PNG filename:
inkscape my-calculation/dependency-dates-01.svg --export-width=2400 --export-filename=my-calculation-preview.png
An SVG is a static report. Editing its dates/text does NOT recalculate; change the input JSON and rerun instead.

SCHEMA
Top-level keys: project_start and tasks, exactly.
project_start: YYYY-MM-DD, from 2000-01-01 through 2100-12-31.
tasks: array of 1–30 objects. Each task requires:
id: unique 1–16 ASCII letters, digits, underscore or hyphen; case-sensitive.
name: 1–44 visible characters. Short Latin text is recommended for verified layout.
duration_days: positive integer calendar-day count. Zero, boolean, text and fractions are rejected.
requires: list of prerequisite IDs, or [] for none. No duplicate IDs, unknown IDs or self-reference.
Optional not_before: YYYY-MM-DD, the earliest date you permit that task to start. Omit the key if not needed; null/blank is not a date.
No other task keys are accepted. IDs, not names, link tasks. Different IDs may have the same name, but keep names distinct for readability. Keep IDs exact, including letter case. Maximum input size 100 KB.

INCLUSIVE DAY RULE
Earliest start = latest of project_start, optional not_before, and EACH prerequisite finish + 1 calendar day.
Finish = start + duration_days - 1.
A 1-day task starts and finishes on the same date. A successor starts no earlier than the next day, not the predecessor's finish day. No same-day handoffs, working-hour calendars, weekends/holidays, lags, leads, zero-day milestones or partial completion are modeled.
Input and computed dates must remain in 2000–2100; an overflow is rejected. A not_before earlier than project_start is valid but cannot pull the task earlier than project_start. Self-dependencies, cycles and disconnected cycles are rejected; no partial report is produced for an invalid graph.
Tasks are reported in deterministic topological order, choosing the alphabetically smallest ready ID. This is a calculation order, not a priority recommendation. Reordering the input tasks does not change the computed results.

READ THE EXAMPLE
All five tasks and dates are invented arithmetic examples, not estimates or suggested task durations.
Project start: 2026-11-10.
A: 2 days, no prerequisites -> November 10–11.
B: 3 days after A -> November 12–14.
C: 1 day after A, but not_before November 15 -> November 15.
D: 2 days after BOTH B and C -> November 16–17.
E: 1 day after D -> November 18.
The calculated span from project start to last finish is 9 inclusive days. It may contain waiting time. It is not the sum of workdays or an effort estimate.

OUTPUTS
results.json stores every full prerequisite list, each candidate start date, all binding constraints, durations, starts/finishes and the input SHA-256.
results.txt is a plain-text review of the same arithmetic.
SVG reports use 8 × 10 inch pages, at most 6 tasks per page. Each bar is proportional to the whole calculated project span; very short bars in a long project may be hard to see. Always read printed dates and durations. Bars do not show resource loading, progress, float or a critical path. Where a prerequisite list exceeds 3 IDs or a binding-constraint list exceeds 2 entries, the SVG shows a count of additional entries; the full values remain in JSON/TXT. Long labels may have smaller text. Other scripts/fonts and physical printing are untested.

FILES
dependency_dates.py; this guide; LICENSE.txt; examples/fictional-project.json; example output results.json, results.txt, dependency-dates-01.svg and 2400 × 3000 PNG. One original report design, not multiple unrelated planners. No PDF, workbook, subscription or live project data.

USE
Choose and verify your own assumptions. The tool cannot tell whether prerequisites, durations or dates are realistic. No deadline, safety, staffing or delivery guarantee is made. This is offline date arithmetic, not a reservation, contract or commitment.

Instant Download

Your files will be available to download once payment is confirmed.  Here's how.

Instant download items don’t accept returns, exchanges or cancellations. Please contact the seller about any problems with your order.

Etsy Purchase Protection
Shop confidently on Etsy knowing if something goes wrong with an order, we've got your back for all eligible purchases — see programme terms

You may also like

Shoppers with similar taste loved these

Show more
Show more
Listed on 08 Nov, 2026